Highlander is an oil field in the central North Sea, operated by NEO NEXT+ Energy. It was discovered in 1976 and produced from 1985 to 2020. Production is suspended. Over its life it produced about 82.8 million barrels of oil and condensate.

Production

Highlander produced about 82.8 million barrels of oil and condensate and 357 million cubic metres of gas between February 1985 and September 2020.

Oil and condensate, barrels a day, by month
Highlander: oil and condensate production by month, February 1985 to September 2020010k20k30k40k1990200020102020

Latest: 100 barrels a day in September 2020. Highest year: 1987, averaging 28,000 barrels a day. Highest month: December 1985.

Gas, million cubic metres a day, by month
Highlander: gas production by month, February 1985 to September 202000.050.10.151990200020102020

Latest: 0 million cubic metres a day in September 2020. Highest year: 1992, averaging 0.075 million cubic metres a day. Highest month: July 1995.

Average production by year

YearOil and condensate, barrels a dayGas, million m³ a day
2020 (Jan–Sep)1,5000
20191,5000.004
20181,7000.008
20171,9000.009
20162,2000.006
20151,9000.003
201400
201300
20121200.002
20111,8000.025
20101,6000.02
20091,8000.009
20081,3000.005
20071,1000.004
20061,9000.007
20052,4000.015
20041,9000.015
20032,1000.014
20022,9000.032
20013,3000.026
20003,2000.023
19992,0000.027
19983,8000.035
19973,0000.025
19965,4000.045
19956,2000.067
19948,4000.058
19938,5000.056
199211,0000.075
199114,0000.044
199018,0000.048
198922,0000.061
198813,0000.028
198728,0000.066
198628,0000.066
1985 (Feb–Dec)22,0000.051

Field details

StatusProduction suspended
TypeOil field
OperatorNEO NEXT+ Energy
Partners
  • Bridge Petroleum 3 Limited 100%
  • NEO NEXT + Energy Oil Trading Limited 0%
Original operatorTexaco
DiscoveredApril 1976 (well 14/20-5)
First productionFebruary 1985
Water depth134 m
RegionCentral North Sea
Wells inside the outline14

Platforms and installations

No platforms or production ships are recorded on the field or within 2 km of it.

Licences

The field lies in this current licence:

P324Bridge Petroleum Group, Dana Petroleum Limited, Ithaca Energy, NEO NEXT+ Energy

Nearby

Sources

Production: NSTA, UKCS field production reports (PPRS), monthly to July 2026. Field details, platforms, licences and wells: NSTA open data, as on the atlas map. Contains information provided by the North Sea Transition Authority and/or other third parties. Used under the NSTA Open User Licence.

Offshore Data Atlas converts the reported volumes to barrels and cubic metres a day (one cubic metre is 6.29 barrels). UK gas figures are all the gas produced, including gas used offshore as fuel, flared or put back into the reservoir.