Oil field · UK

Callanish

Callanish is an oil field in the central North Sea, operated by Harbour Energy PLC. It was discovered in 1999 and has produced since 2008. In July 2026 it produced about 4,200 barrels of oil and condensate and 0.12 million cubic metres of gas a day.

Production

Callanish has produced about 68 million barrels of oil and condensate and 1.8 billion cubic metres of gas since June 2008.

Oil and condensate, barrels a day, by month
Callanish: oil and condensate production by month, June 2008 to July 2026010k20k30k40k2010201520202025

Latest: 4,200 barrels a day in July 2026. Highest year: 2009, averaging 30,000 barrels a day. Highest month: February 2009.

Gas, million cubic metres a day, by month
Callanish: gas production by month, June 2008 to July 202600.250.50.7512010201520202025

Latest: 0.12 million cubic metres a day in July 2026. Highest year: 2010, averaging 0.74 million cubic metres a day. Highest month: December 2009.

Average production by year

YearOil and condensate, barrels a dayGas, million m³ a day
2026 (Jan–Jul)4,8000.14
20257,2000.19
20247,6000.2
20234,7000.14
20229,3000.22
202111,0000.34
20203,3000.093
20193,7000.11
20183,8000.12
20173,1000.097
20163,8000.13
20155,0000.14
20146,7000.15
20139,2000.19
201213,0000.33
201120,0000.5
201028,0000.74
200930,0000.74
2008 (Jun–Dec)22,0000.52

Field details

StatusProducing
TypeOil field
OperatorHarbour Energy PLC
Partners
  • Harbour Energy Petroleum Resources Limited 73%
  • Ithaca MA Limited 16%
  • Chrysaor (U.K.) Sigma Limited 5%
  • Chrysaor Production (U.K.) Limited 5%
Original operatorConocoPhillips
DiscoveredDecember 1999 (well 15/29b-12)
First productionJune 2008
Water depth150 m
RegionCentral North Sea
Wells inside the outline11

Platforms and installations

No platforms or production ships are recorded on the field or within 2 km of it. It is probably produced through wells on the seabed, piped to a platform elsewhere.

Licences

The field lies in these 2 current licences:

P347Harbour Energy PLC, Ithaca Energy
P590Harbour Energy PLC, Ithaca Energy

Nearby

Sources

Production: NSTA, UKCS field production reports (PPRS), monthly to July 2026. Field details, platforms, licences and wells: NSTA open data, as on the atlas map. Contains information provided by the North Sea Transition Authority and/or other third parties. Used under the NSTA Open User Licence.

Offshore Data Atlas converts the reported volumes to barrels and cubic metres a day (one cubic metre is 6.29 barrels). UK gas figures are all the gas produced, including gas used offshore as fuel, flared or put back into the reservoir.