Oil field · UK
Belinda
Belinda is an oil field in the central North Sea, operated by Serica Energy. It has produced since 2026.
Production
Belinda has produced about 5,700 barrels of oil and condensate and 2.5 million cubic metres of gas since March 2026.
Latest: 180 barrels a day in March 2026. Highest year: 2026, averaging 180 barrels a day. Highest month: March 2026.
Latest: 0.082 million cubic metres a day in March 2026. Highest year: 2026, averaging 0.082 million cubic metres a day. Highest month: March 2026.
Average production by year
| Year | Oil and condensate, barrels a day | Gas, million m³ a day |
|---|---|---|
| 2026 (Mar) | 180 | 0.082 |
Field details
| Status | Producing |
|---|---|
| Type | Oil field |
| Operator | Serica Energy |
| Licensee |
|
| First production | March 2026 |
| Region | Central North Sea |
| Wells inside the outline | 2 |
Platforms and installations
No platforms or production ships are recorded on the field or within 2 km of it. It is probably produced through wells on the seabed, piped to a platform elsewhere.
Licences
The field lies in this current licence:
Nearby
Sources
Production: NSTA, UKCS field production reports (PPRS), monthly to July 2026. Field details, platforms, licences and wells: NSTA open data, as on the atlas map. Contains information provided by the North Sea Transition Authority and/or other third parties. Used under the NSTA Open User Licence.
Offshore Data Atlas converts the reported volumes to barrels and cubic metres a day (one cubic metre is 6.29 barrels). UK gas figures are all the gas produced, including gas used offshore as fuel, flared or put back into the reservoir.